consultancy.sawens@gmail.com
417 A&B, 409 A, 4th Floor, Sahara Shopping Centre, Faizabad Road, Lucknow - 226016 (U.P)

Risk Assessment and Disaster Management

Every industrial site, storage facility or construction project carries some level of risk, from a chemical leak to a fire, flood or structural failure. Sawen Group, a QCI and NABL accredited environmental consultancy based in Lucknow, prepares detailed risk assessment and disaster management studies that help you spot dangers early and respond quickly if something goes wrong.

What Is Risk Assessment and Disaster Management?

Risk assessment is the process of studying a site or project to find out what could go wrong, how likely it is to happen, and how serious the impact could be. Disaster management builds on this by preparing a clear action plan, so your team knows exactly what to do before, during and after an emergency.

Put simply, risk assessment tells you where the danger points are, and disaster management tells you how to handle them if they turn into a real incident.

Types of Risks Sawen Group Assess

Our team studies a wide range of risks depending on your project type and location.

Risk Type What We Study?

Chemical & Fire Hazards

Storage, handling and leakage risk of flammable or hazardous material

Structural Risks

Building stability, load capacity and construction safety

Natural Disaster Risks

Flood, earthquake, cyclone and landslide exposure based on location

Process Risks

Dangers linked to machinery, equipment failure or production processes

Environmental Risks

Impact of accidents on nearby air, water and soil quality

Health & Safety Risks

Worker exposure to harmful substances, noise or unsafe conditions

Transport & Storage Risks

Risks during movement or storage of raw material and finished goods

Our Process for Risk Assessment and Disaster Management

  1. Site Study: Our team visits your facility to understand the layout, processes and existing safety measures.
  2. Hazard Identification: We list out every possible risk, from chemical handling to natural disaster exposure.
  3. Risk Analysis: Each hazard is studied for how likely it is and how serious the impact could be.
  4. Plan Preparation: We draft a clear disaster management plan with response steps for each risk identified.
  5. Team Briefing: We walk your staff through the plan, so everyone understands their role.
  6. Mock Drills & Review: We help set up drills and review the plan regularly to keep it effective.

Why Choose Sawen Group for Risk Assessment and Disaster Management?

Feature Why It Matters?

20+ years of field experience

Deep understanding of Indian industrial and regulatory conditions

Multi-disciplinary team

Scientists, engineers and safety specialists working together

QCI & NABL accredited

Reports that regulators and auditors accept with confidence

Site-specific planning

No generic templates, every plan is built around your actual facility

Complete support

From hazard study to mock drills, handled under one roof

Track record with major clients

Experience with government bodies, PSUs and large private companies

Sawen Group's core strength has always been securing environmental clearance for new and expanding projects, and risk assessment along with disaster management planning is a regular part of this work.

This means our studies are built with a clear understanding of what regulators expect to see, not just general safety theory.

How to Get Started Now?

  1. Share your facility type, location and specific concerns with our team.
  2. Get a free discussion on the scope of study required.
  3. Receive a proposal covering cost, timeline and deliverables.
  4. Approve the plan and our team begins the site study.
  5. Receive your completed risk assessment and disaster management plan, ready for use or submission.

Call +91-7379444475 or Request a Proposal to begin.

OUR FAQ

Frequently Asked Questions

business-panel
Have any Question ?

+91 7379444471

Contact Us

Risk assessment identifies possible dangers at a site and how serious they could be. Disaster management builds on this by creating a clear action plan for how to respond if any of those risks turn into a real emergency.

Yes, for many types of projects, especially those handling hazardous chemicals, fuel or gas, or applying for environmental clearance. Requirements can vary based on project category and location.

It is a good practice to review the plan at least once a year, or whenever there is a major change at the site, such as new machinery, expansion, or a change in stored material.

Yes. Along with preparing the plan, our team can guide mock drills and brief staff, so everyone understands their role during an actual emergency.

We study chemical and fire hazards, structural risks, natural disaster exposure, process risks, environmental risks and worker health and safety risks, depending on your facility type.

The time depends on the size and complexity of the facility. Smaller sites can be studied in a couple of weeks, while larger industrial units with multiple hazard types may take longer.

Cost depends on the facility size, number of hazards studied and whether the report is for regulatory submission or internal use. Sawen Group provides a custom quote after reviewing your requirement.

MY CART (0 ITEMS)

Your cart is empty

Request For Proposal

Your Information